Back to search
Closes 30 October 2026 Suits small businesses

Manchester International Airport Phase 2 - Overbridge Civils

Kier Transportation - CP7 NWC
Status
Open
Value
£500k–£1m
Closing
30 October 2026
Where
North West
Contract
27 February 2027 to 1 July 2027
Category
Construction & building
Published
23 October 2026 on Contracts Finder

What the buyer says

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including: • Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections. • Modification of existing bridge cill. • Supply and installation of bridge bearing plates, including associated screed works. • Construction of pile caps/infill. • Placement of in-situ concrete shear key infill. • Construction of the reinforced concrete bridge deck slab. • Construction of reinforced concrete parapet walls. • Placement of in-situ concrete footpaths and fill areas. • Construction of pilasters, including reinforced concrete and brickwork elements. • Supply and installation of parapet and pilaster copings. • Construction of associated fencing, signage and PCC retaining wall. • Installation of associated ducting works. • Completion of highway works excluding final road surfacing. • Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works. • Construction of associated drainage works. Exclusions: Final road/footpath surfacing works are excluded from this scope.