Back to search
Closes 19 January 2027 Suits small businesses

Upper Thurne Package 3 Construction Works

Broads (2006) Internal Drainage Board
Status
Open
Value
£6.5m
Closing
19 January 2027
Where
East of England
Contract
5 April 2027 to 24 November 2028
Category
Construction & building
Procedure
Competitive flexible procedure
Published
16 October 2026 on Find a Tender

What the buyer says

Broads IDB is planning to procure a Contractor for the design and construction of 2 x pumping stations and one culvert, namely Horse Fen pumping station and Somerton South pumping station and Somerton culvert. Each of these sites has an existing asset which will need to be decommissioned. Design for all sites principally consists of tasks as follows:- - Telemetry system - External lighting - Functional Design Specification and Human Machine Interface displays - Sensors and monitoring equipment - Stop log systems and non return gates valves, non return flap valves, penstocks and flow meters - Ducting and draw pits - Precast Concrete Components (outfall structures, pump support slabs and kiosk bases) - Motor Control Centre (MCC), kiosk trench support system and full electrical system design - Control kiosk including Heating, Ventilation and Air Conditioning (HVAC) and, fire and intruder alarm - Temporary works including relevant licenses, permissions and consents The Water Management Alliance (WMA) will oversee this procurement on behalf of the Broads Internal Drainage Board working with Turner & Townsend as advisors.