Back to search
Closes 4 December 2026

Harwich Office Upgrades - HVAC

Trinity House
Status
Open
Value
£325k
Closing
4 December 2026
Where
UK-wide
Contract
18 January 2027 to 17 January 2031
Category
Repairs, maintenance & facilities, Construction & building
Procedure
Below threshold - open competition
Published
23 October 2026 on Find a Tender

What the buyer says

Trinity House have HVAC systems installed in two buildings, known as the main office (3 floors) and buoy yard (2 floors), at their Harwich site. These systems have been operational since 2006 and are maintained on a regular basis. The system consists of a mix of floor wide arrangements with fan coil units in the roof space as well as dedicated room based independent units. All items are from the Daikin range and can be centrally controlled and configured via a portal. These works are for the supply of all the necessary equipment on a like-for-like basis to meet the original building performance (cooling / heating) of all the HVAC systems across two buildings, excluding the two IT server rooms. In addition, all equipment is to be installed, with full co-ordination, noting the need to maintain the working office environment. This will need the full management, installation, and configuration of the systems, with an acceptance test, as well as training on supervisory local and remote platforms.